This project aims to irrigate 4,000 hectares of fruit orchards in the Kale Plain and Şişman village region of Malatya. Construction works completed so far include: 710,000.00 m³ of trench excavation, 26,000 meters of Ø800 - Ø2000 mm CTP main pipeline installation, 40,000 meters of Ø110 - Ø710 mm HDPE network pipeline installation, Construction of 450 irrigation structures, Excavation of a 1,200-meter-long tunnel with a 3.60-meter inner diameter horseshoe cross-section, Construction of 78 meters of highway crossings