Construction of the 8th Military Base Within the Scope of the Syrian Border Operation
- 82,631.01 m³ excavation and filling works
- 2,369.22 m³ reinforced concrete pouring
- 80.67 tons of iron reinforcement works
- 1,936.38 m³ sub-base and road base works
- 59,409.66 kg various iron works
- 1,500 meters of infrastructure piping works
- 50 m² stainless steel water storage construction
- 150-person septic tank construction
- 6,876 m² rocket protection fence installation
- 3,438 m² roofing installation
- 926 meters of 90-gauge helicoidal razor wire fencing
- 905 modular concrete blocks (H: 4.00 m - L: 2.00 m) installed
- 24 bunkers transported and installed
- 36 containers transported and installed
- 6 ballistic rooms transported and installed
- Electrical infrastructure works
Construction of the 6th Military Base Within the Scope of the Syrian Border Operation
- 98,045.16 m³ excavation and filling works
- 2,522.39 m³ reinforced concrete pouring
- 66.52 tons of iron reinforcement works
- 2,304.08 m³ sub-base and road base works
- 95,548.57 kg various iron works
- 1,510.8 meters of infrastructure piping works
- 50 m² stainless steel water storage construction
- 150-person septic tank construction
- 10,108.70 m² rocket protection fence installation
- 5,411.24 m² roofing installation
- 1,046 meters of 90-gauge helicoidal razor wire fencing
- 1,004 modular concrete blocks (H: 4.00 m - L: 2.00 m) installed
- 172 bunkers transported and installed
- 66 containers transported and installed
- 6 ballistic rooms transported and installed
- Electrical infrastructure works