During the period when the project was under our scope, a trench was excavated on the Turkish side by dredging 180,000 m³ of the seabed using a dredging vessel. Additionally, to facilitate material transfer, groyne and dock structures were constructed in the sea using sheet piling. On the TRNC side, approximately 45,000 m³ of dredging was carried out in the land approach areas. The dredging operations on both sides were completed within ten days.