Suruç Plain Pumped Irrigation Project – Taşbasan Left Bank, Phase 1 Network Construction

According to the final progress reports, the project aimed to irrigate the Suruç Plain and included: Construction of 46,000 meters of Ø700 - Ø1900 mm CTP main pipeline,Construction of 250,000 meters of Ø110 - Ø630 mm HDPE network pipeline,Construction of 1,400 irrigation structures