Esenboğa Airport State Aircraft Hangar Construction Project

Construction of two aircraft hangars, each measuring 100m x 100m, 13,500 tons of steel fabrication,6,500 m² VIP office construction,71,800 m² apron and taxiway construction,Two helicopter pads, Fire water storage (V = 2,000 m³), Heating center and transformer building (850 m² closed area), 8 heating boilers with a capacity of 900 kW/h each, 3 transformers with a capacity of 1,600 kW each,230m technical gallery construction (2.5m x 2.5m), Includes fire water system, energy cables, main heat distribution line, water supply lines, and communication cables, 30 m² entrance control building,96 m² entrance gate security building