Boomerang Travel Club Coastal Facilities Construction (Cratos)

Excavation and filling along the coastline over several years using 5,236,710 m³ dredging ships, Coastal fortifications, breakwater works, floating piers, piled docks, and quay construction, Steel platform stage built on steel piles for sea-based shows, Underwater pipelines and underwater electrical and communication cabling, Reverse osmosis desalination system for the hotel’s water needs, Landscaping including an adult swimming pool, children's pool, and green areas